Skip to main content

CONSTRUCTION SAFETY AUDIT

A Construction Safety Audit Built For HSA And HSE Inspection

A chartered walk of your site, your Construction Phase Plan, and every live RAMS, Method Statement, and Lift Plan on the project, scoped against the Construction Regulations 2013 in Ireland and CDM 2015 in Great Britain. You leave with a written gap register and a prioritised corrective action plan you can defend at inspection.

Coyle Group chartered safety advisor reviewing a Construction Phase Plan on an active tier-one Irish construction site with structural steelwork behind
ISO 14001
NSAI Certified
ISO 9001
NSAI Certified
ISO 45001
NSAI Certified
CMIOSH
Founder · Chartered IOSH
NRF Member
National Recruitment Federation
Trustpilot
4.6 / 5 from 23 reviews

What an honest audit finds

Three Deliverables Every Construction Audit Produces

Every engagement leaves the same three artefacts on the project director's desk. Each one is written, signed off by a chartered safety professional, and specific to your site rather than pulled from a template library.

Gap-registered site walk

A walked, photographed, and documented audit of the active site against the Construction Regulations 2013 in Ireland or CDM 2015 in Great Britain. Findings come back numbered, with regulation references and photographs, in a gap register.

  • Plant, work at heights, confined spaces, lifting operations, and traffic management
  • Frontline interviews built into every visit
  • Statutory appointment letters (PSCS, PSDP, contractor dutyholders) reviewed first-pass

Project-specific RAMS and Lift Plan review

Every live document is reviewed against the actual scope of work. RAMS, Method Statements, and Lift Plans are checked page by page for the six site-specific fields no template can fill in.

  • Lift Plans checked against General Application Regulation 42
  • Construction Phase Plan checked for currency against the live programme
  • Documents needing a rewrite flagged individually with owner and date

Chartered corrective action register

A written register, prioritised by risk. Each action carries a named owner and a target date. Every report is signed off by a CMIOSH-chartered advisor against the same legislative frame an HSA or HSE inspector uses.

  • Prioritised actions, not a verbal walkthrough
  • Chartered sign-off on every report
  • Defensible at the next regulator visit
Book a construction safety audit

Common failure modes

What Tier-One Construction Audits Typically Miss

These are the patterns our chartered team sees on active Irish and UK construction sites. Any one of them will surface as a finding at inspection if the audit did not catch it first.

  • Template-library RAMS pulled across projects that cannot be defended against the specific scope of work at inspection.
  • Construction Phase Plans that were current at tender but have not been maintained as the build has progressed through phases.
  • Duplicate PSCS appointments across contractors on the same project, a compliance failure our team has resolved on a live substation build.
  • Lift Plans that do not stand up to General Application Regulation 42, surfaced only when the lift is already on the critical path.

Audit Capacity At Chartered Scale

100+
Safety people in the talent pool
Industry-specific construction and engineering specialists
48h
Global mobilisation
Project-ready in 48 hours, in writing
1M+
Hours of safety work
Across construction and engineering sectors

Why clients move to Coyle

A Coyle Construction Audit Versus A Generalist Compliance Inspection

The difference shows up in who signs the report, how the RAMS come back, and how quickly we can put a chartered safety officer on the ground if the audit surfaces work that needs closing.

Comparison of a Coyle Group construction safety audit against a generalist compliance inspection
Feature Coyle Group Generalist Consultancy
Reviewer Junior assessor with no active construction-regulations practice
Regulatory frame Generic ISO checklist applied across sectors
Tier-one contractor familiarity (Multiplex, Sisk, Suir, Kirby) No documented tier-one construction track record
Documentation review Template-pulled sample; documents not checked against live scope
Reporting Verbal walkthrough with no written register
Mobilisation 4 to 6 week lead time

Reviewer

Generalist Consultancy

Junior assessor with no active construction-regulations practice

Regulatory frame

Generalist Consultancy

Generic ISO checklist applied across sectors

Tier-one contractor familiarity (Multiplex, Sisk, Suir, Kirby)

Generalist Consultancy

No documented tier-one construction track record

Documentation review

Generalist Consultancy

Template-pulled sample; documents not checked against live scope

Reporting

Generalist Consultancy

Verbal walkthrough with no written register

Mobilisation

Generalist Consultancy

4 to 6 week lead time

Book a construction safety audit

Related engagements

Where This Audit Sits In The Stack

The construction audit runs under the same chartered HSE function as our audits and inspections service line, and plugs into HSE recruitment when the corrective actions need a safety officer on site to close them.

What clients say

Trusted On Tier-One Sites Across Ireland And The UK

Operations and EHS leads at tier-one operators rate the chartered oversight we bring to every construction audit. These are their words, verbatim.

“A fresh pair of eyes: he will often spot the potential for hazard.”

Brian Linton
Operations Manager, Energia

“Gavin has supplied competent EHS personnel… we want to go further, making all our plants safer.”

Liam Mannion
H&S Manager, ESB International

“Coyle-Group have become leaders in the Wind Industry with a dedicated competent Health and Safety Team.”

Declan Carroll
Enercon
Book a construction safety audit

Questions we hear most often

Construction Safety Audit Questions Answered

What does a construction safety audit actually cover?

A Coyle Group construction safety audit covers three layers on the same visit. First, the live physical work: plant and machinery, work at heights, confined spaces, lifting operations, and traffic management, walked and photographed against the Safety, Health and Welfare at Work (Construction) Regulations 2013 in Ireland or CDM 2015 in Great Britain. Second, the project documentation: Construction Phase Plan, RAMS, Method Statements, Lift Plans, and PSCS or PSDP appointment letters. Third, the workforce interviews that confirm what is written is what the site is doing. You receive a written gap register and a prioritised corrective action plan signed off by a CMIOSH-chartered advisor.

Is the audit scoped against Construction Regs 2013, CDM 2015, or ISO 45001?

All three, depending on jurisdiction and buyer. For Irish sites the primary frame is the Safety, Health and Welfare at Work (Construction) Regulations 2013, sitting under the Safety, Health and Welfare at Work Act 2005. For Great Britain the primary frame is the Construction (Design and Management) Regulations 2015. ISO 45001 sits alongside where the client wants standards conformance in the same visit. A single corrective action register addresses statutory compliance and standards conformance together so the project team is not tracking two lists.

Who signs off the audit report?

A CMIOSH-chartered advisor writes and signs off every report, using the same legislative framework an HSA or HSE inspector would apply. Our internal quality management system is itself audited by NSAI to ISO 45001, ISO 14001, and ISO 9001, which regulators and tier-one clients can verify independently.

How quickly can Coyle Group mobilise a construction safety audit?

We confirm mobilisation within 48 hours globally, in writing. On the first call we scope the audit, agree access arrangements, and confirm the chartered advisor. If the audit surfaces work that needs a safety officer on the ground to close corrective actions, we deploy from a standing talent pool of more than 100 industry-specific specialists on the same 48-hour window.

Do you audit PSCS and PSDP appointments as part of the engagement?

Yes. Statutory appointments are checked as a first-pass review. We look for duplicate PSCS appointments across contractors on the same project (a compliance failure we have resolved on a live substation build), missing PSDP appointment letters, and Construction Phase Plans that have not been updated as the build has progressed. These findings are called out in the gap register with a specific reference to the Construction Regulations 2013 duty at issue.

CMIOSH · ISO 45001 NSAI · 48-hour mobilisation

Get A Construction Audit That Holds Up At Your Next HSA Or HSE Visit

We scope the audit on the first call and put a CMIOSH-chartered advisor on your construction site, in writing, within 48 hours.

Book a construction safety audit